Resurfacing northbound lanes of Mackinac Bridge starts April 9; will be done by June 18
Resurfacing northbound lanes of Mackinac Bridge starts April 9; will be done by June 18
COUNTIES: Emmet/Mackinac
HIGHWAY: I-75 (Mackinac Bridge)
CLOSEST CITIES: Mackinaw City and St. Ignace
ESTIMATED STARTING DATE: April 9
ESTIMATE COMPLETION DATE: June 18
Project: The Mackinac Bridge Authority (MBA) will resurface the entire northbound side of I-75 on the Mackinac Bridge beginning in mid-April. The project includes concrete deck and steel joint repairs, and replacement of concrete curb.
Traffic Restrictions: Northbound traffic will be shifted to the southbound side from Jamet Street in Mackinaw City to the toll booths in St.Ignace. Two-way traffic will be maintained for the duration of the project. Wide loads will be restricted to crossing only once a day, between the hours of 4am and 5am. Motorists are encouraged to use extreme caution and drive at or below the posted speed when crossing the bridge. Passing will not be allowed.
Customer Benefit: The $3.2 million project includes this 2008 work on northbound I-75 and also in 2009 work on southbound I-75. Once completed, the life of the deck will be extended by several years and motorists will enjoy a smoother ride.
###
Protect Michigan families: Where Workers Present Drive 45!- A message from MDOT and Michigan’s Give ’em a Brake Safety Coalition