Mackinac Bridge Authority

Spanning the Straits of Mackinac since 1957

Mackinac Bridge causeway, near St. Ignace, will be resurfaced beginning Monday, Sept. 15

Posted on September 5th, 2008

Mackinac Bridge causeway, near St. Ignace, will be resurfaced beginning Monday, Sept. 15

Sept. 5, 2008 – The Mackinac Bridge Authority (MBA) today announced that the causeway, near the toll booths, will be resurfaced beginning Monday, Sept. 15. The causeway/road work includes milling and resurfacing.

During construction, two-way traffic on the causeway will be maintained with lane closures and shifts. The contractor is H & D, a division of Rieth-Riley Construction Co., Inc.

All work is expected to be completed by Oct. 10, 2008.

Motorists are asked to be patient and drive with caution through the construction zone and near the toll booths.

All four lanes (two lanes in each direction) will be open to traffic on weekends.

Print Friendly, PDF & Email